Skip to content

release(skills): publish calle 1.0.4 OAuth setup guidance - #179

Merged
Ray-56 merged 1 commit into
mainfrom
release/calle-1-0-4
Nov 2, 2026
Merged

Ray-56 merged 1 commit into
mainfrom
release/calle-1-0-4

Conversation

@Ray-56

@Ray-56 Ray-56 commented Nov 2, 2026

Copy link
Copy Markdown
Collaborator

Keep MCP connection setup separate from API Key acquisition and storage. Native MCP managers handle OAuth discovery directly; any host-required OAuth fields or allowed hosts come from actual server metadata and the host schema. A separately hosted OAuth authorization server remains part of MCP and is validated separately from the configured MCP server URL.

Prepare standalone calle 1.0.4, synchronizing Skill/evaluation metadata and current installation references. Preserve MCP-first routing, explicit interface choices, fallback conditions, and existing-call recovery. npm and plugin versions are unchanged.

Validation:

  • Repository checks and the full Node/package suite passed with Corepack pnpm 10.18.3. A temporary PATH entry selected the installed npm JavaScript entry point for the local shell-wrapper environment.
  • 274 offline Skill tests passed; package dry-runs passed.
  • Both complete ZIPs passed CRC, inventory, and source-byte comparisons. The 19-file canonical ZIP has SHA-256 f0755a90f86a3e9cfa2277a37ce6bc66769c8dce122be8dacd7e8cf325b4a316; the four-file compatibility ZIP matches its published artifact.
  • New host-managed-discovery and separate-OAuth-host variants remain NOT_RUN. A pre-versioning Muse candidate was installed and its native card showed an added connection, with MCP connection success reported; terminal call results and the full tool inventory were not observed. This is not complete live acceptance of the 1.0.4 artifact.

After successful CI, publish the accepted commit under immutable tag skills/calle@1.0.4 with complete ZIPs, a source/artifact manifest, and SHA-256 checksums. Evidence and limits: docs/verification/calle-1.0.4-oauth-setup-2026-11-02.md.

@Ray-56
Ray-56 merged commit 58562dd into main Nov 2, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant