CI/CD #363
ci-cd.yml
on: schedule
Matrix: build-test-alpine
Matrix: build-test-debian
Matrix: push-alpine-base
Matrix: push-debian-base
Matrix: push-alpine-nginx
Matrix: push-alpine-node
Matrix: push-debian-nginx
Matrix: trigger-downstream
Annotations
7 errors
|
trigger-downstream (kool-dev/docker-wordpress)
Parameter token or opts.auth is required
|
|
trigger-downstream (kool-dev/docker-php-swoole)
The strategy configuration was canceled because "trigger-downstream.kool-dev_docker-wordpress" failed
|
|
trigger-downstream (kool-dev/docker-php-swoole)
Parameter token or opts.auth is required
|
|
trigger-downstream (kool-dev/docker-php-sqlsrv)
The strategy configuration was canceled because "trigger-downstream.kool-dev_docker-wordpress" failed
|
|
trigger-downstream (kool-dev/docker-php-sqlsrv)
Parameter token or opts.auth is required
|
|
trigger-downstream (kool-dev/docker-phpqa)
The strategy configuration was canceled because "trigger-downstream.kool-dev_docker-wordpress" failed
|
|
trigger-downstream (kool-dev/docker-phpqa)
Parameter token or opts.auth is required
|